Sand excavation Dura Vermeer

About this project

Location

Rotterdam

Period

March 2021

Type of project

Earthmoving

Non-stop sandbox excavation

Excavate 1,450 m³ of sand

Over the weekend, Dura Vermeer carried out a major project on the railway. A section of disused track was removed and then filled in with soil. All the necessary equipment was supplied by Tuytel.

Project in brief

  • 430 cubic metres

    Sand moved with the crawler excavator and various dumpers

  • 1.208

    Return trips with sand truck from construction site to landfill site

  • 98%

    Project experienced minimal downtime thanks to prompt service.

  • 73 days

    Duration of this project.