Location
Badhoevedorp – Holendrecht
Period
1–2 November 2025
Type of project
Earthmoving
We recently completed a great weekend job for Veenix along the A9 motorway. With our team, we managed to:
• Existing asphalt removed
• Rubble foundation excavated
• Existing EPS blocks stacked
• Trench excavated for new EPS blocks
• New EPS blocks installed
• New rubble paving laid as a base for asphalt
• The embankment filled with sand and soil
An intensive project that went smoothly, thanks in part to the dedication and expertise of our employees. We are proud to have been able to contribute to the work on the A9 motorway in this way.